Last Update 18 hours ago Total Questions : 120
The EXIN EPI Certified Data Centre Specialist content is now fully updated, with all current exam questions added 18 hours ago. Deciding to include CDCS practice exam questions in your study plan goes far beyond basic test preparation.
You'll find that our CDCS exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these CDCS sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any EXIN EPI Certified Data Centre Specialist practice test comfortably within the allotted time.
What is the main disadvantage of using a ToR (Top of Rack) design?
An MCB needs to be installed in the PDU of an ICT rack. Which breaking curve should you select?
What is the main advantage of using an End-of-Row (EoR) design?
What is a significant difference between a halocarbon gas-based fire suppression system and an inert gas-based fire suppression system?
An air-conditioner unit needs to be selected. Two types are available:
Unit-A has a Sensible Heat Ratio (SHR) of 0.7.
Unit-B has a Sensible Heat Ratio (SHR) of 0.9.
From an efficiency point of view, which one should be selected?
The computer room has high levels of H2S gas contamination. What is the best option to resolve this issue?
What is the minimum requirement for the power feeds to the building for a Rated-3 data center based on the ANSI/TIA-942 standard?
Can you install a raised floor tight to the perimeter of the room?
Which gas-based system in general requires a larger amount of gas in order to be effective, a halocarbon gas-based fire suppression system or an inert gas-based fire suppression system?
You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F. Calculate the approximate CFM required to cool the equipment in the rack.
