Summer Sale Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ex2p65

Exact2Pass Menu

Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8)

Last Update 19 hours ago Total Questions : 198

The Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8) content is now fully updated, with all current exam questions added 19 hours ago. Deciding to include NCSE-Core practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our NCSE-Core exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these NCSE-Core sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Nutanix Certified Systems Engineer-Core (NCSE-Core 6.8) practice test comfortably within the allotted time.

Question # 4

A VDI environment based on AHV Cluster is not performing well. The current environment is using only one bridge (BridgeO). An administrator need to verify if nodes are using all network card associated to BridgeO. Which two menus should be used to check the current configuration? (Choose two.)

A.

Host NICs tab in Hardware menu

B.

Host view in Network menu

C.

1.0 Metrics tab VM menu

D.

Network Configuration item in Setting menu

Question # 5

A prospect is evaluating solutions to support a project. The SE proposes a hybrid model as recommended by size in addition to nutanix, the prospect is evaluating an all flash storage array. The storage administrator is concerned about the performance the hybrid configuration and claims that the flash array is less expensive the it Director sees the benefits of Nutanix but needs to address the team's concerns.

Which two Nutanix features should be discussed to address the concems

of the storage administrator? (Choose two)

A.

Data Locality

B.

NVMe support

C.

40Gb/s support

D.

Capacity Planner

E.

Automatic Data Tiering

Question # 6

After a meeting with a new prospect to demo Nutanix for a Splunk opportunity, the prospect requests a POC.

To qualify the need for a POC, which question should an SE ask the prospect first?

A.

Are you considering other solutions?

B.

What do you plan to evaluate?

C.

Is this project budgeted?

D.

Which version of Splunk are you running?

Question # 7

Refer to the exhibit.

***Exhibit is Missing***

Based on the sizing scenario, what level of resiliency can be inferred about the configuration?

A.

FTT1

B.

N+0

C.

N+1

D.

N+2

Question # 8

Prospective customer explains their current infrastructure and upcoming goals. They are a fast-growing software company with approximately 3000 employees. Engineering accounts for approximately half of total staff and is behind on product releases.

This department has been building their own infrastructure using available hardware, SaaS offerings, and public cloud.

There's a new CIO attempting to gain control of existing and incoming

information systems while supporting the agile environment responsible for their rapid innovation with a minimal staff. From this information, which two addressable pain points or gaps should be discerned?(Choose two)

A.

System availability issues

B.

SQL Server performance issues

C.

""Shadow IT"" that increases the risk of security breaches and brand damage

D.

Slow response time from the infrastructure group (SLAs) that could result in product release delays

E.

significantly degraded end user experience

Question # 9

What is the main function of Oplog?

A.

A persistent write buffer to coalesce bursts of random writes before destaging to the extend store

B.

A memory cache to coalesce all writes before destaging to the extent store

C.

A persistent write buffer to coalesce all writes before destaging to the extent store

D.

A memory cache to coalesce bursts of random writes before destaging to the extent store

Question # 10

Using the Sizing Option shown, which two configurations are possible configurations that Sizer could provide in Automatic mode? (Choose two) ????

A.

6x NX-8055-G7 (2 x 7.68TB SSD + 10x 6TB HDD per node)

B.

4x NX-1075S-G7 (4x 3.85TB SSDs per node) + 4x NX-8035-G7 (6x 3.84TB SSD per node)

C.

3x NX-3060-G7 (2x 1920GB SSDs per node) + 3x NX-10755-G7 (4x 3.84TB SSDs per node)

D.

6x NX-3060-G7 (6x 1920GB SSDs per node)

Go to page: