You'll find that our SAFe-SPC exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these SAFe-SPC sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any SAFe Practice Consultant SPC (6.0) practice test comfortably within the allotted time.

Question # 31

(Select 3) According to Lean thinking, how is fast and sustainable flow achieved?

A.

By understanding the full Value Stream.

B.

By constant reduction of delays.

C.

By reducing batch sizes.

D.

By applying subjective governance.

Question # 32

Your organization decided to thoroughly implement the SAFe Principle "Assume variability; preserve options." What is the optimum path for success?

A.

Assume variability of scope and preserve options for the release date.

B.

Preserve flexibility in system functionality and design, but have fixed Solution intent.

C.

Assume variability of scope, but have fixed Solution Context.

D.

Preserve flexibility in both system functionality and design.

Question # 33

What is the primary purpose of the management meeting at the end of Day 1 of PI Planning?

A.

To assign business value to the teams' draft PI Objectives.

B.

To make adjustments to the PI scope and address program challenges.

C.

To design the next generation of the product.

D.

To evaluate the performance of teams.

Question # 34

(Select 4) What are the 4 primary reasons why long queues are bad?

A.

Higher variability

B.

Decreased motivation

C.

Less cross-training

D.

More multitasking

E.

Slower delivery

F.

Lower quality

Question # 35

What statement applies to Iteration Planning in SAFe?

A.

Iteration Planning is required in every Iteration to enable fast learning cycles.

B.

Teams that have no dependencies may choose not to do Iteration Planning once they have planned the PI.

C.

Component teams require Iteration Planning in every Iteration, while Feature teams may or may not, based on dependencies.

D.

Iteration Planning is required for all Iterations except for the first one, since there's nothing to cause a change in the PI plan yet.

E.

When the teams define acceptance criteria during PI Planning, Iteration Planning is not strictly required during the PI.

Question # 36

Enablers can be used for any activities that are necessary to support upcoming business features, but generally they fall in one of 3 categories:

A.

Architecture

B.

Team tasks

C.

Exploration

D.

Vertical slice of a feature

E.

Infrastructure

Question # 37

UESTION NO: 15 [Building Solutions with Agile Product Delivery]

(Select 2) When might Feature size not be a good substitute for the duration of WSJF?

A.

The Feature did not originate from a Program Epic.

B.

The Feature involves a team or team members who represent a bottleneck.

C.

The Feature did not originate from a Value Stream Capability.

D.

The Feature involves a remote third-party vendor that has a formal scope-approval process.

E.

The Feature has not yet been broken down into user stories by the Product Owner.

Question # 38

ARTs that consist only of Feature teams do not require an Architectural Runway.

A.

True

B.

False

Question # 39

What is the most effective way to train the System Team members to operate effectively as part of the train?

A.

Have them attend Leading SAFe training and Scrum Master orientation.

B.

Have them attend Leading SAFe training.

C.

Have them attend SAFe for Teams training with all other teams on the train.

D.

Have them attend Implementing SAFe training with SPC certification.

E.

Have them review the SAFe Foundations presentation and provide on-the-job training.

Question # 40

What is the correct statement about Work in Process (WIP)?

A.

The bigger the WIP, the richer the feedback.

B.

The amount of WIP is unrelated to utilization.

C.

Lower WIP limits foster collaboration.