Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: buysanta

Exact2Pass Menu

Pure Certified FlashArray Implementation Specialist (FAIS) Exam

Last Update 21 hours ago Total Questions : 234

The Pure Certified FlashArray Implementation Specialist (FAIS) Exam content is now fully updated, with all current exam questions added 21 hours ago. Deciding to include FlashArray-Implementation-Specialist practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our FlashArray-Implementation-Specialist exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these FlashArray-Implementation-Specialist sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Pure Certified FlashArray Implementation Specialist (FAIS) Exam practice test comfortably within the allotted time.

Question # 4

A customer has submitted a Pure Engagement Request (PER) / Implementation Workbook (IWB) and the stated array name is "123".

What is the issue with this array name?

A.

Array name cannot start with a digit.

B.

Array name must be 4 characters or more.

C.

Array name must be alphanumeric.

D.

Array name cannot contain hyphens.

Question # 5

An Implementation Engineer is performing a FlashArray//XR4 to FlashArray//XL upgrade, and is preparing to remove the XR4 CT0 controller. Which command should the Implementation Engineer run to stop Purity after confirming CT0 is the secondary controller?

A.

purewes controller disable --purity --verify-mode secondary --verify-array ARRAY_NAME ct0

B.

purewes controller disable --purity --verify-mode primary --verify-array ARRAY_NAME ct0

C.

purewes controller setattr --disable --verify-mode secondary --verify-array ARRAY_NAME ct0

Question # 6

If a Technical Support Engineer (TSE) is not available to perform health checks after an installation, what action should the Implementation Engineer take?

A.

Email the account team

B.

Update and close the case.

C.

Verify that Remote Assist (RA) is open and update the case.

Question # 7

Which cards are required to connect a DirectFlash Shelf to an FlashArray//XLR5?

A.

2-Port 100GbE iSCSI/RoCE

B.

2-Port 50GbE

C.

2-port 200GbE Ethernet/RoCE

Question # 8

For a new FlashArray installation, a customer's network team has NOT provisioned network ports for management connectivity. How Will this affect the installation process?

A.

The array's data will be inaccessible.

B.

Management connectivity is required for installation.

C.

The customer Will be unable to login to the array.

Question # 9

An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU. At what step should the Implementation Engineer contact support for assistance?

A.

After removing the fully evacuated drives before proceeding with the hardware NDU

B.

After removing the Old drives and inserting any new ones

C.

When the hardware NDU has been completed

Question # 10

What are the default replication ports on all three rack unit FlashArray models?

A.

ETH2 and ETH3

B.

ETH4 and ETH5

C.

ETH0 and ETH1

Go to page: