You'll find that our FlashArray-Implementation-Specialist exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these FlashArray-Implementation-Specialist sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Pure Certified FlashArray Implementation Specialist (FAIS) Exam practice test comfortably within the allotted time.

Question # 61

Which FlashArray//XL DirectMemory Modules (DMMs) configuration condition is true?

A.

DMMs are only compatible with //XL 170.

B.

DMMs cannot be installed in a DirectFlash Shelf (DFS).

C.

DMMs use different drive slots to regular DirectFlash modules.

Question # 62

After completing an installation, the customer requests to configure replication IP settings. Where in the GUI does the customer need to navigate in order to do this?

A.

Storage > Replication

B.

Storage > Array Connections

C.

Settings > Network

D.

System > Configuration

Question # 63

An Implementation Engineer is onsite to add a new 91TB (10 x 9.1TB) data pack to a FlashArray that includes a DirectFlash Shelf. The chassis currently contains two write groups, one 45TB (10 x 4.5TB) and one 91TB (10 x 9.1TB). The shelf contains a single 45TB (10 x 4.5TB) write group. The customer requests that the new data pack be added as part of a wide write group. How should the Implementation Engineer meet this request?

A.

Have support set a tunable to allow the wide write group to extend between the chassis and shelf; then add the drives to the shelf to extend the write group from the chassis.

B.

Add the drives to the shelf and then run puredrive admit --wide-write-group to admit them into the same write group in the shelf.

C.

Move the chassis write group of 45TB (10x4.5TB) to the shelf and then add the new data pack to the chassis.

Question # 64

What is the the minimum supported capacity requirement for a FlashArray//XL170R5?

A.

115TB

B.

135TB

C.

90TB

Question # 65

How many chassis capacity drive slots come standard on a FlashArray//X Gen 2 chassis?

A.

28 slots

B.

20 slots

C.

24 slots

D.

40 slots

Question # 66

An Implementation Engineer is going on site to complete a data pack evacuation and perform a hardware NDU.

At what step should the Implementation Engineer contact support for assistance?

A.

After removing the fully evacuated drives and before proceeding with the hardware NDU.

B.

When the hardware NDU has been completely finished.

C.

After removing the old drives and inserting any new ones, but before they rebuild.

D.

Before starting the data pack evacuation process.

Question # 67

An Implementation Engineer runs check start validate-array-health before starting a FlashArray//X70R3 to FlashArray//X70R5 HWNDU and receives code 60 alert indicating an unhealthy NVRAM module in CH0.NVB1. What action Should the Implementation Engineer take to resolve this?

A.

Disable the unhealthy NVRAM module and proceed With HWNDU after confirming there is no degraded data.

B.

Reseat the unhealthy NVRAM module, and then verify it is in a healthy status prior to proceeding with the HWNDU.

C.

Proceed with the HWNDU, the //X70 model has a four NVRAM configuration so the array still has redundancy.

Question # 68

After rebooting a controller, which command should an Implementation Engineer run to verify all the Purity services have started successfully?

A.

pureadm

B.

pureadm list

C.

pureadm status --all

Question # 69

During an NDU, when is the Implementation Engineer required to install additional NVRAM modules in slots 2 and 3?

A.

Upgrading a FlashArray//X50R3 to a FlashArray//X70R4

B.

Upgrading a FlashArray//X50R3 to a FlashArray//X50R4

C.

Upgrading a FlashArray//X70R4 to a FlashArray//X90R4

D.

Upgrading a FlashArray//X10R3 to a FlashArray//X20R4

Question # 70

What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?

A.

2 QSFP cables / 3 Mellanox cards / 20 DFMDs

B.

3 QSFP cables / 4 Mellanox cards / 10 DFMDs

C.

4 QSFP cables / 2 Mellanox cards / 20 DFMDs