You'll find that our PSP exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these PSP sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Planning & Scheduling Professional (PSP) Exam practice test comfortably within the allotted time.
Determine the correct formula and date for the late start for Activity 9001.

The Scope of Work divides the major deliverables into smaller more manageable components for all of the following EXCEPT to:
Which of the following risks CANNOT be estimated by BILCO with only a resource-loaded schedule?
Activity durations are normally estimated in an intuitive and subjective way. All of the following will improve duration accuracy EXCEPT
When should the project documents be reviewed to assess their impact on the organization and administration of a project?
All the following describe the critical path of a schedule EXCEPT:
The amount of time that an activity can be delayed from its early start date without delaying project completion is called:
Scenario:
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.

PSP Activities Table
Scope Known about Rock-Filled Dam Project :
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing " no differing sit conditions " and " no damage for delay " clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobi lization. Indirect costs per calendar day are $2,800 for the " normal " schedule and $3,200 for the " crashed " schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor ' s operati ons by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.

Theoretically construct a summary activity for only those activi ties with a finish-to-start relationship for Activities 8001 through 10001. Using the " normal " schedule, what is the cost of this hammock?
Why does activity 11001 not show successor activities?

Which of the following will NOT affect the total float calculation of a non-resource leveled schedule?