You'll find that our LEED-AP-BD+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-BD+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Building Design + Construction (LEED AP BD+C) practice test comfortably within the allotted time.

Question # 91

When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

A.

10%

B.

25%

C.

50%

D.

75%

Question # 92

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public ' s input

Question # 93

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

A.

Light Pollution Reduction, Places of Respite, Open Space

B.

Heat Island Reduction, Places of Respite, Site Master Plan

C.

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Question # 94

Which of the following documents contains the design team ' s interpretation of the Owner ' s Project Requirements?

A.

Basis of Design (BOD)

B.

Simple Box Energy Model Analysis

C.

System ' s manual

D.

Integrated Project Delivery report

Question # 95

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

A.

Total fixture power

B.

Site area of the project

C.

Quantity of installed luminaires

D.

Total fixture lumens below 90 degrees

Question # 96

In order to achieve the requirements of LEED, the Electrical Vehicle Supply Equipment (EVSE) must comply with:

A.

State, but not regional standards established for electrical vehicles operated within the state of vehicle operation

B.

Regional, state, or local standards for the electrical connectors to be used

C.

Level 1 charging capacity (110 volts AC)

D.

Manufacturer ' s standards established for electrical vehicles operated within the state of vehicle primary operation

Question # 97

Which group of chemicals emitted by some building materials is linked to asthma, chronic obstructive pulmonary disease, and cancer?

A.

Nitrogen Oxides (NOx)

B.

Polyvinyl Chlorides (PVCs)

C.

Chlorofluorocarbons (CFCs)

D.

Volatile Organic Compounds (VOCs)

Question # 98

A Photovoltaic (PV) system was installed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning (Cx) and Verification?

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission his own installations and share the results with the project owner

C.

The Cx agent for the project must conduct or oversee the Cx of the PV system

D.

The building ' s mechanical engineer should commission his own installations and share the results with the project owner

Question # 99

Which of the following statements are true for Erosion and Sedimentation Control (ESC) plan prerequisite compliance?

A.

The ESC plan cannot be modified during the design phase of the LEED certification

B.

The ESC plan can be developed or modified during the design phase of LEED certification

C.

A compliant ESC plan may be developed during construction

D.

A compliant ESC plan must be in place when the commissioning authority is appointed

Question # 100

Which of the following contributes to the value of the commissioning process?

A.

Ensuring that the project budgetary goal is met

B.

Verifying that the building systems perform as intended

C.

Verifying that the building water fixtures are installed properly

D.

Ensuring that the project is delivered to meet the permitting requirements