LEED AP Building Design + Construction (LEED v5 AP BD+C)

Last Update 16 hours ago Total Questions : 454

The LEED AP Building Design + Construction (LEED v5 AP BD+C) content is now fully updated, with all current exam questions added 16 hours ago. Deciding to include LEED-AP-BD+C practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our LEED-AP-BD+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-BD+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Building Design + Construction (LEED v5 AP BD+C) practice test comfortably within the allotted time.

Question # 91

The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.

The project consists of a single building that includes the following:

• 150 guest rooms

• A small restaurant

• An indoor pool

• Conference spaces

• Event spaces

• Six tenant spaces

A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two of the six tenant spaces have not yet been leased. The property is 10 acres, adjacent to a lake, and has trail access to public lands for hiking. It is anticipated that occupants will mostly arrive by car, but there is one public bus trip per day from the nearest town.

The project consists of the building, parking lots for overnight guests and daily visitors, a walking path to the lake, and hiking trails leading to the public lands. The project has a goal of being Gold certified under LEED for New Construction.

When determining occupancy for the project, how should the project team account for the occupancy for the future spa, gift shop, coffee shop, tour operator space, and the two unknown tenant spaces?

A.

Use zero as the number of occupants for unleased spaces

B.

Use an estimate of the number of occupants based on the project team ' s discretion

C.

Use the default occupancy counts from the LEED Reference Guide for the incomplete spaces

Question # 92

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

A.

Innovation Credit, Innovation

B.

Integrative Process Credit

C.

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Question # 93

Which of the following types of water should a project team focus on utilizing to achieve water savings and acquire points under WEc2: Enhanced Water Efficiency, Option 6. Water Reuse, Path 1. Reuse-Ready System, while reducing reliance on potable water?

A.

Desalinated ocean water provided by a utility company

B.

Graywater collected and treated on-site

C.

Harvested and stored rainwater

Question # 94

During a design charrette, community neighbors raise a concern about potential glare resulting from a project ' s highly reflective roof. Which change should the LEED AP recommend to best address these concerns without negatively impacting other LEED credits?

A.

Change the design to incorporate rooftop solar panels

B.

Change the roofing material to a dark material to eliminate the issue

C.

Change the design to reduce the amount of roofing area

D.

Change the design to include a vegetative roofing system

Question # 95

Which of the following is true regarding LEED Pilot Credits?

A.

Pilot Credits are not specific to the rating systems

B.

Pilot Credits can be attempted in the design review stage only

C.

A registered Pilot Credit must be replaced on the LEED project ' s scorecard if that pilot credit is removed from the Pilot Credit Library

D.

Pilot Credit feedback surveys must be completed

Question # 96

For IPp2: Human Impact Assessment, the team wants to use the ground-floor spaces to achieve both social equity and occupant experience. Which design features would achieve this dual objective?

A.

Designing public retail space as a café with seating in an adjacent plaza

B.

Locating the building 0.25 mi. (0.40 km) from a subway stop and providing secure bicycle storage

C.

Installing MERV-13 filters in all residential units and using low-VOC paint in the retail spaces

Question # 97

How much value would these two doors contribute toward Material and Resources Credit, Building Product Disclosure and Optimization – Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

A.

$150.00

B.

$50.00

C.

$100.00

D.

$125.00

Question # 98

When following the LEED Building Design and Construction Integrative Process credit, which of the following is the approach for the design team to follow?

A.

Locate a solid waste provider that has sorting capabilities

B.

Assure the aesthetics will match existing neighborhood conditions

C.

Identify synergies among building systems and equipment

D.

Determine if green vehicles will be applicable to the project

Question # 99

According to Location and Transportation Credit, Sensitive Land Protection, Option 2: Floodplains requirement, projects that do not have legally adopted flood hazard maps should locate on a site that is:

A.

Entirely outside any floodplain subject to a1% or greater chance of flooding in any given year

B.

Within afloodplain subject to a 3% or greater chance of flooding every other year

C.

Outside any floodplain subject to a2% or greater chance of flooding in any given 5-year period

D.

Entirely outside any floodplain subject to a3% or greater chance of flooding in any given 10-year period

Question # 100

When the project occupancy is not known, which method is recommended?

A.

Default occupant density from ASHRAE 62.1-2010, Table 6-1

B.

Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A

C.

Weekly average taken into account all the occupants in a typical 24-hour day of operation

D.

Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns