Ticking Clock Black Friday Special: 75% Off! Apply coupon code below to save on all exam bundles! - Ends in 0d 00h 00m 00s - Coupon code: 75epass

Exact2Pass Menu

LEED AP Building Design + Construction (LEED v5 AP BD+C)

Last Update 16 hours ago Total Questions : 454

The LEED AP Building Design + Construction (LEED v5 AP BD+C) content is now fully updated, with all current exam questions added 16 hours ago. Deciding to include LEED-AP-BD+C practice exam questions in your study plan goes far beyond basic test preparation.

You'll find that our LEED-AP-BD+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-BD+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Building Design + Construction (LEED v5 AP BD+C) practice test comfortably within the allotted time.

Question # 131

Which of the following strategies can be used to decrease the envelope load of a building?

A.

Provide summer solar shading

B.

Maximize daylighting

C.

Decrease opaque wall area

D.

Use economizers for free cooling

Question # 132

The owner of a 40,000 ft² (3,716 m²) site containing a one-story museum with a 10,000 ft² (929 m²) building footprint and 5,000 ft² (465 m²) of native vegetated landscaping purchases an adjacent 30,000 ft² (2,787 m²) concrete surface parking lot.

The owner plans to construct a 10,000 ft² (929 m²) museum addition and an adjacent exterior sculpture garden.

What is the minimum area of the sculpture garden that must be covered with native or adapted vegetated ground cover to achieve SSc1: Biodiverse Habitat?

A.

3,000 ft² (278 m²)

B.

14,000 ft² (1,300 m²)

C.

12,000 ft² (1,115 m²)

D.

10,000 ft² (929 m²)

Question # 133

When working on a renovation project, asbestos containing materials have been found on the perimeter walls. When calculating the percentage of building being reused under the Materials and Resources Credit, Building Life-Cycle Impact Reduction, the materials remediated will be

A.

included in the calculation

B.

excluded from the calculation

C.

excluded if the total volume is less than 25% of the building being reused

D.

excluded if the total volume is more than 25% of the building being reused

Question # 134

In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement of

A.

Materials and Resources Prerequisite, Storage and Collection of Recyclables

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients

C.

Materials and Resources Credit, Construction and Demolition Waste Management

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations

Question # 135

The results of a building energy model show that a building will consume 2,200,435 kilowatt-hours (kWh) per year (building is served solely by electricity). The building owner wants to achieve Energy and Atmosphere Credit, Green Power and Carbon Offsets. What is the minimum amount of green energy required to be purchased on an annual basis?

A.

770,152 kWh

B.

2,200,435 kWh

C.

550,109 kWh

D.

1,100,218 kWh

Question # 136

Which of the following is an example of a diverse use as defined by Location and Transportation Credit, Surrounding Density and Diverse Uses?

A.

Automated Teller Machine (ATM)

B.

Informal day care

C.

Public park

D.

Private university gym