You'll find that our LEED-AP-BD+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-BD+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Building Design + Construction (LEED AP BD+C) practice test comfortably within the allotted time.

Question # 71

An office is relocating to a new facility. Any furniture that is relocated to the new site can contribute as a reused material for Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials if it was purchased:

A.

At least two years prior to the date of project registration

B.

Within the past five years

C.

Within two years of the substantial completion of the project

D.

At least five years prior to the certification of the project

Question # 72

Which of the following mandatory recyclable materials is required by MRp1: Planning for Zero Waste Operations for storage and collection?

A.

Textiles

B.

Ceramics

C.

Corrugated cardboard

Question # 73

A project team is using the whole building simulation model to quantify the percentage of energy savings for the project. Which of the following should remain the same for both the baseline building and the proposed building?

A.

Building operating schedule and occupancy hours

B.

Building operating schedule and total window area

C.

Building envelope construction and occupancy hours

D.

Total window area and building envelope construction

Question # 74

For a new project with a $10 million construction cost, the weight of the total recycled content is 0.9 tons (816.5 kilograms) each for post-consumer and pre-consumer recycled content. The value of the total recycled content is one million each for post-consumer and pre-consumer recycled content. What is the percentage of recycled content that contributes toward Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2, Leadership Extraction Practices?

A.

33%

B.

20%

C.

40%

D.

18%

Question # 75

Which of these is a method to assess the regional context of a building's design for sustainability?

A.

Conducting a site analysis

B.

Consulting with neighbors

C.

Improving a design threshold

D.

Performing an energy analysis of the building

Question # 76

For schools intended for grades eight and below (or ages 14 and below), which of the following scenarios would demonstrate compliance with Location and Transportation Credit, Access to Quality Transit, Schools, Option 2. Pedestrian Access?

A.

30% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

B.

50% of the students live no more than a 3/4 mi. (1.20 km) walking distance from a functional entry of a school building

C.

30% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

D.

50% of the students live no more than a 1 1/2 mi. (2.40 km) walking distance from a functional entry of a school building

Question # 77

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

A.

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Question # 78

Innovation credits for exemplary performance can be awarded for

A.

achieving one pilot credit

B.

achieving double the credit requirements

C.

demonstrating significant environmental benefits

D.

demonstrating a qualitative improvement in environmental performance

Question # 79

A luxury hotel project is in the design phase and is located on a scenic waterfront. It is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be desirable considering the location of the project?

A.

Energy and Atmosphere Credit, Optimize Energy Performance, Exemplary Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance

Question # 80

Which of the following characteristics are a requirement of a compliant water meter?

A.

Must be digital

B.

Must be permanently installed

C.

Must transmit data to a remote location

D.

Must be capable of storing data for 36 months