You'll find that our LEED-AP-BD+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-BD+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Building Design + Construction (LEED v5 AP BD+C) practice test comfortably within the allotted time.

Question # 61

Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

A.

Supply air velocity

B.

Number of occupants

C.

System ventilation efficiency

D.

Supply air temperature set point

Question # 62

Which of the following water management practices can be applied to identify and address hidden leaks in the water system of a commercial building?

A.

Implement a comprehensive reporting system for water usage

B.

Set up a separate meter for each floor of the building

C.

Install an advanced system with sensors throughout the plumbing network

Question # 63

Which of the following buildings meets the Minimum Program Requirements for LEED certification?

A.

A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre site

B.

A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre site

C.

A 2,500 ft2 (232 m2) mobile Health Clinic located on a previously constructed above-water dock

D.

A 5,000 ft2 (465 m2) Science Education center on an above-water pier that is being built specifically for the Education center

Question # 64

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate

A.

all luminaires have full cutoff fixtures

B.

all luminaires have a minimum color temperature of 3500 K

C.

all luminaires meet acceptable fixture ratings for the project ' s Model Lighting Ordnance (MLO) lighting zone

D.

all luminaires are mounted at least three mounting heights from the lighting boundary

Question # 65

When designing a building that includes Electric Vehicle Supply Equipment (EVSE), which capability is needed to ensure maximum energy efficiency and cost savings?

A.

Install EVSE that operates only during peak hours to ensure availability

B.

Integrate EVSE with demand-response programs and load-management strategies

C.

Install Level 1 charging stations with 120-volt service for all spaces

Question # 66

In the Indoor Environmental Quality Credit, Low-Emitting Materials, what types of products need to be evaluated for

both Volatile Organic Compound (VOC) content of the material and VOC emissions of the material?

A.

Flooring

B.

Furniture

C.

Composite wood

D.

Wet applied products

Question # 67

A project will renovate a building with historic designation into new office space. The surface area of the existing building structure and envelope is 100,000 ft² (9,290 m²). How much of the existing building will need to be reused to earn 5 points for the Materials and Resource Credit, Building Life-Cycle Impact Reduction?

A.

90,000 ft² (8,361 m²)

B.

There is no minimum

C.

80,000 ft² (7,432 m²)

D.

At least 50% of the surface area

Question # 68

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

A.

The credit is not feasible for this project

B.

The credit may be achieved by using nonroof measures only

C.

The credit is applicable for projects that document this special condition

D.

The credit can only be achieved by using an alternative compliance path

Question # 69

A neighborhood housing development organization has dual goals, promoting occupant ' s health and minimizing

energy costs. What LEED Building Design and Construction, New Construction credit might the LEED AP propose to best achieve the organization ' s dual goals?

A.

Location and Transportation Credit, Access to Quality Transit

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Low Emitting Materials

D.

Indoor Environmental Quality Credit, Daylight

Question # 70

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

A.

U.S. Internal Revenue Service

B.

U.S. Department of Agriculture

C.

U.S. Environmental Protection Agency

D.

U.S. Department of Housing and Urban Development