You'll find that our LEED-AP-BD+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-BD+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Building Design + Construction (LEED AP BD+C) practice test comfortably within the allotted time.

Question # 61

During construction, a value engineering exercise was conducted. This exercise has resulted in cost savings for the project. However, it is expected that the changes will affect some of the energy efficiency measures. The team has already submitted Energy and Atmosphere Credit, Optimize Energy Performance for review, and Green Business Certification Inc. (GBCI) returned an anticipated reply. What should the project team do in this situation?

A.

The project team should submit a clarification in the form of a narrative stating the changes in the design without updating the energy model

B.

At construction review submission, the energy model information must be updated to reflect all changes in the design, and the credit is guaranteed to be awarded

C.

The project team must incorporate the changes in their energy model and confirm the effect on the energy performance credit

D.

The project team need not do anything as GBCI already marked it as an " anticipated " credit

Question # 62

Large commercial buildings are most often dominated by

A.

internal loads

B.

lighting loads

C.

external loads

D.

envelope loads

Question # 63

To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate

A.

all luminaires have full cutoff fixtures

B.

all luminaires have a minimum color temperature of 3500 K

C.

all luminaires meet acceptable fixture ratings for the project ' s Model Lighting Ordnance (MLO) lighting zone

D.

all luminaires are mounted at least three mounting heights from the lighting boundary

Question # 64

For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

A.

Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony

B.

Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)

C.

Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium

D.

Plastic armrests, 30% of product by weight, with added antimicrobial treatment

Question # 65

Which of these is a method to assess the regional context of a building ' s design for sustainability?

A.

Conducting a site analysis

B.

Consulting with neighbors

C.

Improving a design threshold

D.

Performing an energy analysis of the building

Question # 66

Which of the following actions should be taken to ensure that project team members understand and prioritize the selection of materials compliant with the Materials and Resources Credit: Building Product Disclosure and Optimization?

A.

Select locally sourced and manufactured materials

B.

Procure materials directly from raw material suppliers

C.

Include all building materials in a whole-building life-cycle analysis

D.

Include the material requirements in the project specifications

Question # 67

A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?

A.

Track waste materials per occupant

B.

Track waste materials used on site

C.

Document total waste by project cost

D.

Document total waste per building floor area

Question # 68

In order for a product to contribute to Materials and Resources Credit, Building Product Disclosure and Optimization, Environmental Product Declarations, Option 1. Environmental Product Declaration, the product needs to be

A.

Forest Stewardship Council (FSC)-certified

B.

cradle-to-cradle certified

C.

third-party verified in a Corporate Sustainability Report (CSR)

D.

critically reviewed life-cycle assessment conforming to ISO 14044

Question # 69

The goal of the design charrette during Integrative Process Prerequisite, Integrative Project Planning and Design is to:

A.

Develop the building energy model

B.

Optimize the green strategies across all aspects

C.

Calculate the life cycle cost of the building

D.

Choose an appropriate Commissioning Authority (CxA)

Question # 70

The project team achieved a strategy not addressed in the LEED Green Building Rating System, which proved to be a significant, measurable environmental benefit for the project. What can the project team do in order to get a benefit for this strategy?

A.

Submit a regional priority credit

B.

No benefit can be achieved since the strategy is not included in the rating system

C.

Submit the manufacturer ' s product declaration

D.

Submit an innovation credit