You'll find that our LEED-AP-BD+C exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these LEED-AP-BD+C sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any LEED AP Building Design + Construction (LEED v5 AP BD+C) practice test comfortably within the allotted time.

Question # 111

A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

A.

91 lighting control devices

B.

93 lighting control devices

C.

100 lighting control devices

D.

103 lighting control devices

Question # 112

A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

A.

Protects greenfields and farmland

B.

Preserves habitat and natural resources

C.

Reduces need for new utility infrastructure

D.

Reduces potential damage to an existing stream

Question # 113

Which of the following methods is the referenced standard for demonstrating compliance with EQp2: Fundamental Air Quality?

A.

ASHRAE 55-2010

B.

ASHRAE Guideline 44

C.

ASHRAE 62.1-2022

D.

ASHRAE 90.1-2010

Question # 114

A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

A.

At least 75% of qualifying land areas within 3/4 mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within 1/2 mile (0.80 km) are previously developed

C.

The project is a Federal Renewal Community site

D.

The site is a brownfield as defined by the Environmental Protection Agency

Question # 115

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

A.

Wall

B.

Steel

C.

Glass

D.

Concrete

Question # 116

The Lakeside Resort is a hotel in a rural area located about 60 mi. (96.6 km) from the nearest town, which has a population of 10,500. There are no other towns for over 200 mi. (321.9 km). The surrounding community is largely made up of ranches and federal- and state-owned land.

The project consists of a single building that includes 150 guest rooms, a small restaurant, an indoor pool, conference spaces, event spaces, and six tenant spaces. A lease has been secured for a future spa, gift shop, coffee shop, and tour operator. Two tenant spaces have not yet been leased. The 10-acre property is adjacent to a lake and provides trail access to public lands.

When drawing the LEED boundary for this project, the project team should include all:

A.

Of the development footprint (parking lots, building, sidewalks, and paths around the property) plus the land extending 100 ft. from the development footprint

B.

Land associated with the project and adjacent areas that include attractions occupants are expected to use

C.

Contiguous land that is associated with the project and supports its typical operations

Question # 117

Which of the following categories is included in a human impact assessment for LEED projects to guide planning, design, and operations?

A.

Historical landmarks

B.

Demographics

C.

Soil composition

Question # 118

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Question # 119

To achieve SSc6: Light Pollution Reduction using the Backlight, Uplight, and Glare (BUG) Rating Method, projects must demonstrate that all luminaires:

A.

Meet acceptable fixture ratings for the project’s Model Lighting Ordinance (MLO) lighting zone

B.

Have a minimum correlated color temperature of 3,500 K

C.

Are mounted at least three mounting heights from the lighting boundary

D.

Are full-cutoff fixtures

Question # 120

A LEED Building Design and Construction project includes an outdoor stage for theatrical performances. In pursuit of Sustainable Sites Credit, Light Pollution Reduction the engineer has specified an LED fixture to illuminate actors on the stage while limiting light pollution. Which of the following suggestions should the LEED AP give to the project owner?

A.

Modify the design to enclose the performance areas

B.

Calculate the return on investment over the 20-year life of the project

C.

Compare the energy consumption against an alternative

D.

Inform the owner that the LED fixture is exempt from Sustainable Sites Credit, Light Pollution Reduction