Question # 4

Which organizational level is a Work Center assigned to?

A.

Plant

B.

Storage location

C.

Client

D.

Production supervisor

Full Access
Question # 5

What controls the material BOM item category?Note: There are 2 correct Answers to this question.

A.

A work center is required.

B.

A change number is required.

C.

A material number is required.

D.

A negative quantity is allowed.

Full Access
Question # 6

What happens if the characteristic status is not set to Released?

A.

The characteristic can only be changed.

B.

The characteristic cannot be assigned to a class.

C.

A value of this characteristic cannot be assigned in configuration.

D.

A value of this characteristic cannot be assigned in classification of a configurable material.

Full Access
Question # 7

What do you have to keep in mind when working with value hierarchies?Note: There are 2 correct Answers to this question.

A.

Value nodes are values.

B.

Only available for characteristics with CHAR or NUM format.

C.

Value nodes are not values.

D.

Only available for characteristics with CHAR format.

Full Access
Question # 8

What do you have to keep in mind when copying a group BOM to a plant specific BOM?Note: There are 2 correct Answers to this question.

A.

The internal BOM number stays unchanged.

B.

The material component must have a plant assignment.

C.

The header status has to be active.

D.

The BOM usage can be changed.

Full Access
Question # 9

What is the easiest way to check whether a model is consistent with regard to the processing mode of the configuration profile and object dependencies?

A.

You use the Check Model function in the (VC modeling Environment PMEVC).

B.

You use the Extras function in the material configuration (Simul./ModelingCheck Model CU50).

C.

You use the function Inconsistent VC Models in the app Variant Configuration Overview.

D.

You use the Check Model function in the Simulate Configuration Models app.

Full Access
Question # 10

Which data base tables use the Product Master?

A.

Tables for Master Data Management.

B.

Tables only for Product Master.

C.

Tables only for Material Master.

D.

Tables for Product Master and Material Master.

Full Access
Question # 11

Why is a Work Center assigned to a Cost Center?

A.

For assignment to find suitable people

B.

For costing to use activity types

C.

For scheduling to determine transportation time and queue time

D.

For capacity to use shift sequences

Full Access
Question # 12

What objects can be changed with a change number? Note: There are 2 correct Answers to this question.

A.

Bills of Material

B.

Cost Centers

C.

Work Centers

D.

Task Lists

Full Access