You'll find that our PMI-002 exam questions frequently feature detailed scenarios and practical problem-solving exercises that directly mirror industry challenges. Engaging with these PMI-002 sample sets allows you to effectively manage your time and pace yourself, giving you the ability to finish any Certified Associate in Project Management (CAPM) Certification practice test comfortably within the allotted time.

Question # 136

Which of the following is an output of a Verify Scope process?

A.

Formal acceptance

B.

WBStemplate

C.

SOW acceptance

D.

Rework

Question # 137

A project is considered successful when:

A.

The project meets or exceeds the expectations of the stakeholders.

B.

The product of the project has been manufactured.

C.

The project sponsor announces the completion of the project.

D.

None of the above

Question # 138

Which characteristic distinguishes the network diagram from the Gant chart?

A.

Critical dependencies

B.

Few resources

C.

Critical dates

D.

key milestones

Question # 139

When a project is being performed under contract, who provides SOW ?

A.

The buyer

B.

The contractor

C.

The Project sponsor

D.

The Project manager

Question # 140

___________ is a group of processes required to purchase or acquire products, services, or results needed outside the project team to perform the work.

A.

Procurement Management

B.

Planning Management

C.

Scope Management

D.

Control Management

Question # 141

Which of the following statements are FALSE about cost reimbursable contracts?

A.

cost-reimbursable contracts generally carry the highest risks to the buyer, as the total costs are uncertain

B.

cost-reimbursable contracts often includes incentives for meeting or exceeding project objectives

C.

cost-reimbursable contracts resemble fix unit agreements when the unit rates are preset by the buyer and seller

D.

cost-reimbursable contracts are contracts that involves payments to the seller for actual costs, plus a fee representing the sellers profit

Question # 142

Which of the following is useful in Identify Risks because it permits a systemic evaluation of the work?

A.

Work breakdown structure.

B.

Design specification

C.

Project flow chart

D.

Project chart

Question # 143

What techniques are used to control the project schedule?

A.

Pareto diagram

B.

Performance measurement

C.

Parametric modeling

D.

Statistical sampling

Question # 144

Which of the following are NOT tools or techniques of the Activity Definition process?

A.

Expert judgment

B.

Decomposition, templates

C.

Rolling wave planning

D.

Schedule network templates

Question # 145

Random variance in a process, as measured by the standard deviation can be directly reduced by:

A.

Studying scatter diagrams.

B.

Increasing the number of quality inspectors.

C.

Improving the overall system of production.

D.

Identifying patterns of variance.

Question # 146

You are project manager of a project. A customer requests a scope change in the project . In order to determine the impact of the requested change, you will need a work breakdown structure, change request, scope management plan, and:

A.

Performance reports.

B.

A responsibility matrix.

C.

A Pareto diagram

D.

A Monte Carlo simulation.

Question # 147

You are a project manager and the management wants you to help them determine which projects should be selected for implementation. In a project selection model, the most important factor is which one of the following?

A.

Business needs

B.

Type of constraints

C.

Budget

D.

Schedule

Question # 148

_______ must be measured regularly to identify variance from the plan.

A.

Project performance

B.

Stakeholder requirements

C.

Schedule progress

D.

Cost and schedule

Question # 149

A forward and backward pass indicted total float is equal to - 30 days. This indicates that:

A.

The critical path must be evaluated to determine actual slack time.

B.

The project is estimated to be-20 days ahead of schedule.

C.

Two branches converge on a node.

D.

Duration compression may be required to meet the original project scope.

Question # 150

A primary function of the change control board is to:

A.

Review the impact of change request.

B.

Issue change requests.

C.

Identify new areas of project work.

D.

None